Newly placed in the room:
Gun chamber to be added to the top of the column:
Anchored into position on the anti-vibration table:
This was not without some last minute modifications so all the equipment coming this month can make it through the hallways:
The Thermo Fisher engineers will need time to assemble and align the microscope and then Gatan engineers will be able to install the K2 direct detector. More updates to come!