 

#  The Talos Arctica has arrived! 

 





May 02, 2018

 

 

 Newly placed in the room:

   ![arctica1.jpeg](/sites/g/files/omnuum8871/files/styles/hwp_1_1__720x720_scale/public/cryo-em.hms.harvard.edu/files/arctica1.jpeg?itok=JAZZGAaR) 

 

 Gun chamber to be added to the top of the column:

   ![gunchamber.jpeg](/sites/g/files/omnuum8871/files/styles/hwp_1_1__720x720_scale/public/cryo-em.hms.harvard.edu/files/gunchamber.jpeg?itok=L4k8vOMs) 

 

 Anchored into position on the anti-vibration table:

   ![arctica3](/sites/g/files/omnuum8871/files/styles/hwp_1_1__360x360_scale/public/cryo-em.hms.harvard.edu/files/arctica3.jpeg?itok=L0hi0nbO) 

 

 This was not without some last minute modifications so all the equipment coming this month can make it through the hallways:

   ![wall](/sites/g/files/omnuum8871/files/styles/hwp_1_1__360x360_scale/public/cryo-em.hms.harvard.edu/files/wall.jpeg?itok=x-GQ0GLt) 

 

 The Thermo Fisher engineers will need time to assemble and align the microscope and then Gatan engineers will be able to install the K2 direct detector. More updates to come!



 

 

 



 

 

 Share on:- [     Facebook ](#)
- [     Twitter ](#)
- [     Linkedin ](#)